Axial Fan Inspection for Commissioning by Dave Furrer, PE

Axial Fan Inspection for Commissioning by Dave Furrer, PE

Inspection of axial fans for commissioning is a critical step in ensuring the efficiency, safety, and reliability of industrial and HVAC systems. As part of a deeper dive into equipment manufacturer’s literature, I’ve put together an overview of the procedure for inspecting axial fans with…

Read More
Building Maintenance: Winter Preparation

Building Maintenance: Winter Preparation

Winter is coming for most of us in the northern hemisphere and that means it’s time to perform some last-minute maintenance checks on your HVAC system. Here are some maintenance items to check to prevent later, larger issues. • Determine what isn’t working prior to…

Read More
Air Handling Unit Control: Night Setback & Free Cooling

Air Handling Unit Control: Night Setback & Free Cooling

The building automation system (BAS) has the capability to perform whole building, complex sequence of operations. Two simple sequences that lead to big energy savings are night setback and free cooling. A complex air delivery system or a basic packaged rooftop unit with a stand-alone…

Read More
Do I Need A Commissioning Systems Manual?

Do I Need A Commissioning Systems Manual?

First and foremost, many energy programs give you points for enhanced commissioning including the turnover of a commissioning systems manual as a requirement. More points typically translates to a more efficient building and more accolades. Aside from that, as building systems become more and more…

Read More